Right of Way (ROW) Maintenance

ROW JPS Pipeline

The Pipeline and Hazardous Material Safety Administration (PHMSA) holds ultimate authority for interstate pipeline compliance in the U.S.

Right of Way (ROW) Maintenance

After a transmission pipeline is installed, the pipeline right-of-way (ROW) must be maintained by the pipeline operator to allow for inspection of surface conditions as required by federal law. The transmission pipeline operator must maintain the ROW vegetation so that it will not hinder pipeline inspection and maintenance activities.

JPS Performs The Following Services:

 

  • ROW mowing
  • ROW spraying
  • Mulching

Contact JPS Pipeline Solutions